Northbrook Park District is replacing the playground at Stonegate Park, 3425 Whirlaway Drive. This playground was installed in 1999 and is 23 years old, which is the end of its life cycle.

The rubber surfacing is peeling, and the equipment is rusting and cracking. Soil borings, planning, and construction documents for the park improvements will be completed in 2022, and bidding and replacement is scheduled to be completed in 2023.

With community input, the District completed and adopted a ten-year Comprehensive Master Plan which includes an annual Capital Improvement Plan. These documents forecast repair and replacement needs for parks, facilities and equipment each year.

There are two playground designs that are being considered by the Park District. Complete the survey below to pick your playground!

Contribute to Our Playground Survey

Please Note: Survey Closes on Tuesday, October 11 at 11:59pm.

For more information about this project, contact us by email or call 847-291-2960.